Cart

Magfinity Installation Process

There are three types of installations for the Magfinity series:
1) Surface Mounted
2) Suspended
3) Recessed
Below are the different options easily described, step by step, for a smooth and correct installation.

Please choose installation type from below:

Manuals are designed for basic mounting installations. Choose the mounting option according to the ceiling type. For custom installation that requires special assistance, please contact our team for detailed information.

Surface Mounted / Suspended options

Step 1: Measure MAGfinity track Layout

Taking the MAGfinity track and terminal box dimensions into consideration, measure and draw your desirable track line on the drywall surface.

Step 2: Insert Pin

Insert the pin into the slots on the power plate and terminal box.

Step 3: Attach Terminal Box

Using the coupler, attach and fasten the terminal box to the MAGtrack.

Step 4: Power & wiring

Find the ideal placement for remote LED drivers either at the nearest utility room or the track power box. From there, run the wires to approximate terminal box location.

Step 5: Attach the mounting clips

Take a precise measurement at the MAGfinity track for straight and leveled clips positioning. Attach mounting clips to your surface with a screw.

Step 6: Mounting the MAGfinity track

Connect power wires to the terminal box. Take internal power plates out of the MAGfinity track and place it into the opening. Make sure your track is straight and level.  Screw the fixture through right into a bracket, one by one.

Step 7: Secure MAGfinity track

Place the MAGfinity track securely against the mounting clips, make sure the clips sit in the track. Firmly rotate to fasten each clip.

Step 8: Joining MAGfinity track: Pin & Coupler

If needed, connect all the MAGfinity track's consecutive elements with a pin in between the power plates located on each component.
After successful pin connection, secure two MAGfinity elements by coupler

Step 9: Placing the luminaires

Snap-in place the desirable luminaires. Enjoy the installation!

Step 1: Power and Wiring

Find the ideal placement for remote LED drivers. Either at the nearest utility room or the track power box. From there, run the 16-18 gauge wires to your J-Box location.

Step 2: Take Measurements

Measure the desired height from the fixture to the ceiling. The power feed cable is 16 ft long, the fixture can be placed within that distance. Make sure to save 6 inches for electrical connection at the j-box. And save 6 inches for electrical connection at the terminal box. Cut and discard excessive cable length.

Step 3: Aircraft Cable

Unscrew the grippers from the hangar mounts. Slide the hangar mounts onto the top side of the track.
The aircraft cable’s length can be adjusted through the gripper.Cut and discard excessive cable length.
Complete step by screwing the gripper back to the hangar mounts.

Step 4: Terminal Box Wiring

Take the terminal box out and remove the cover by sliding out. Using a screwdriver, remove the pre-installed wires from the terminal box. Make sure to keep the internal wires untouched. Insert power feed cable from the canopy set to the terminal box and fasten them with a screwdriver.
- Black is negative (Black to Black)
- White is positive (White to Red)

Step 5: Attach Terminal Box

Insert the pin into the slots on the power plate and terminal box. Using the coupler, attach and fasten the terminal box to the MAGfinity track.

Step 6: Mount Bracket

Fasten the mounting bracket to the J-box with the provided screws.

Step 7: J-Box Wiring

Pull the feeding cable through the cable bushing on the canopy plate.
Connect the feeding cable wires from the inside of the canopy to the preinstalled electrical wires inside the J-box using WAGO connectors.

Step 8: Canopy Placement

Using the screws on the side, Insert the canopy cover plate over the mounting bracket. Securely place it on the j-box.

Step 9: Joining MAGfinity Track

If needed, connect all the magtrack's consecutive elements with a pin in between the power plates located on each component. Please make sure to slide the hangar mounts onto the top side of another MAGfinity track before connection.

Step 10: Placing the luminaires

Snap-in place desirable luminaires and enjoy the installation!

Recessed Installation Manual

RTS Pendant. J-box installation

Two preinstalled octagon shape j-boxes or j-box with round cover recommended for the proper and clean installation.

A: j-box cover plate; B: mounting plates; C: hanger bolts; D: cable retainer; E: cable bushing; F: mounting brackets; G: bracket pins; H: aircraft cable caps; I: grippers; J: aircraft cable 16ft

Step 1 - Getting ready

Prior to installation, make sure nothing is missing from the list above; the electrical power is off, and necessary tools are handy.

Step 2 - Preparing the mounting plates

Insert the hanger bolt into the cable retainer, and screw it through the mounting plate.
Fit the cable bushing on the canopy plate with the power feed opening.

Step 3 - Taking measurements

Measure the desired height from the fixture to the ceiling. The aircraft and power feed cables are 16 ft long and the fixture can be placed within that distance.

Step 4 - Securing the cable

Pull the feeding cable through the cable bushing and the mounting plate. Secure at least 6 inches of the line on the mounting plate in the cable retainer using two small screws.

Step 5 - Wiring

Connect the feeding cable wires accordingly to the preinstalled electrical wires inside the J-box.

Step 6 - Secure mounting plate

Fasten the mounting plate to the J-box with provided screws.

Step 7 - placing the canopy

Insert the canopy cover plate through the hanger bolt and securely place it on the j-box.

Step 8 - Suspend

Attach the aircraft cable by screwing the cable cap onto the hanger bolt.

Step 9 - securing the mounting brackets

Attach the mounting bracket at the desired location alongside the backtrack of the fixture and secure it with the bracket pin.

Step 10 - attaching the aircraft cable

Screw the gripper in the center hole of the bracket, all the way in. Make sure it’s in all the way, tight and secure. Push the aircraft cable in to adjust the desirable length, ensuring that the fixture is level.

Step 11 - Final Adjustments

Ensure that the fixture is level, cut and discard unnecessary length of aircraft cable. Clean the fixture. The installation is complete.

Step 1: Measure MAGfinity track Layout

Taking the MAGfinity track dimensions into consideration,  measure and draw your desirable track line on the drywall surface.

Step 2: Cut Into Drywall

Cut into drywall to create opening. Make sure the cut is precise and does not exceed 1/8" of a fixture size for a sharp looking installation.

Step 3: Power & Wiring

Find the ideal placement for remote LED drivers either at the nearest utility room or the track power box. From there, run the wires to either end of your opening.

Step 4: Attach Connector

Using WAGO connectors, attach 3 pin connectors to your power supply wires. Each power supply requires 110/277 VAC connection.

Step 5: Track Placement

Join the flexible 2 pin connectors first and place the track into the drywall opening.
Note: For single fixture run, attach the end cap to both ends.

Step 6: Secure Track In Place

Secure the track with the screws through the trim holes around. Make sure the track is secured.

Step 7: Connect Next Element

If needed, connect all consecutive elements of the track with the 2 pin connectors located on each component. Secure into place by following step 6 with the newly consecutive tracks. For multiple fixture runs, attach the end caps to the beginning and the end of your run.

Step 8: Secure Connected Track Into Place

Secure the newly connected track with screws through the trip holes around. Make sure the track is secured. Continue Step 7 and 8 for any continuing tracks.

Step 9: Patch Plaster

Using painter's tape, cover the track slot. Add plaster on the track trim and smoothly patch it with a compound knife. Even the patched drywall surface out. Let it dry 12 hours minimum.

Step 10: Finishing

Sand, the patched area, make sure to sand along the taped edge area for a smooth transition.

Step 11: Luminaire Placement

Snap-in place desirable luminaires and enjoy the installation.